SPANNeND

Spanungskoordination unter Nutzung von Blindleistung zwischen Netzbetreibern Digital

The goal of the University of Kassel e2n is to develop an AI-OPF, which can realize the flexibility determination under consideration of uncertainties from forecasts and schedules, plants with local Q-control, regulatory and network conditions such as N-1 network security, protection configurations and possibly costs of Q-procurement processes. The OPF should be able to determine the Q-flexibility range on the part of the TSO as well as the Q-demands at the grid interconnection points and the characteristic parameters for individual plants or grid clusters.  The uncertainty from day-ahead/short-term forecasts and measurements will be evaluated by an AI-based method to be developed and will be coupled with the AI-OPF. The functionality of the developed method will also be verified in simulation and field test context and brought into online operation of the flexibility platform.


Project Details

Contact PersonDenis Mende, Nils Bornhorst
Duration01.01.2022 - 30.06.2025
PartnerFraunhofer Institut für Energiewirtschaft und Energiesystemtechnik IEE, TEN Thüringer Energienetze GmbH & Co. KG
SubprojectKI-basierte Blindleistungsoptimierung unter Berücksichtigung von Unsicherheiten
Funding

Federal Ministry for Economic Affairs and Climate Action (BMWK),

Funding Code: 03EI4040D