Theses

The content on this page was translated automatically.

Theses

2016 - 11 Hutter, Norbert, Supervisor : Franz, Schleicher,Investigation of the effect of the use of calcium nitrate-based setting accelerators on the construction process using the example of the construction of two apartment buildings, Bachelor, Status: in progress.
2016 - 11 Thomae, Jens, Supervisor : Franz, Schleicher,Investigation of the effect of the use of calcium nitrate-based setting accelerators on the construction process using the example of an industrial building, Bachelor, Status: in progress.
2016 - 08 Pippert, David, Supervisor : Franz, Sharmak,Development of process models with the help of BPMN2.0 for the acceptance and testing of engineering structures in road construction within the scope of Hessen Mobil, Bachelor, Status: completed.
2016 - 07 Arica, Yeliz, Supervisor : Franz, Racky,Construction process disruptions in special civil engineering - empirical investigation of causes, consequences and responsibility, Bachelor, Status: completed.
2016 - 07 Diehl, Laura, Supervisor : Franz, Racky,Possibilities of alternative dispute resolution in the construction industry, Bachelor, Status: completed.
2016 - 07 Kauffeld, Tim, Supervisor : Franz, Racky,Investigation of noise pollution on construction sites with special consideration of construction machinery and its effects on workers and residents, Bachelor, Status: completed.
2016 - 07 Schnürer, Vanessa, Supervisor : Franz, Racky,Possibilities and obligations of documentation by the client during construction, Master, Status: completed.
2016 - 07 Zerf, Dimitri, Supervisor : Franz, Becker,Safety and health aspects of concreting abutments in bridge construction, Bachelor, Status: completed.
2016 - 06 Cosmann, Maren, Supervisor : Franz, Schopbach,Fire protection in timber construction - Approaches to simplifications in Eurocode 5-1-2, Master, Status: completed.
2016 - 05 Rippien, Louisa, Supervisor : Franz, Racky,Investigation of the sustainability of intelligent building control systems for the operation of residential buildings, Bachelor, Status: completed.
2016 - 04 Oertel, Tobias, Supervisor : Franz, Racky,Changes in the VOB Part C since 2000 and their effects on tendering and invoicing, Bachelor, Status: completed.
2016 - 03 Schierle, Henriikka, Supervisor : Franz, Racky,Investigation of the possibilities and measures for site managers to increase the motivation of employees on the construction site, Bachelor, Status: completed.
2016 - 02 Faust, Jan-Felix, Supervisor : Franz, Gnerlich,Investigation of different detection methods for disturbed construction processes with regard to liability-based causality, Master, Status: completed.
2016 - 02 Krutmann, Dominik, Supervisor : Franz, Racky,Reduction of errors in tender processing and acquisition in medium-sized construction companies through the introduction of a quality management system, Bachelor, Status: completed.
2015 - 12 Ranft, Johannes, Supervisor : Franz, Racky,Analysis of construction defects after acceptance in commercial construction, Bachelor, Status: completed.
2015 - 12 Stanzel, Timo, Supervisor : Franz, Racky,Causes of defects in exposed concrete and their effects on the concrete appearance, Bachelor, Status: completed.
2015 - 11 Gasz, Katharina, Supervisor : Franz, Becker,Development of a manual for the qualified determination of the necessary safety distances between traffic facilities and the outer boundaries of workplaces or traffic routes facing the flowing traffic on road construction sites, Master, Status: completed.
2015 - 11 Neisner, Tanja, Supervisor : Franz, Racky,Development of an internal soil management system to optimize the recycling and disposal of accumulating soil materials, Master, Status: completed.
2015 - 09 Mokros, Svenja Neele, Supervisor : Franz, Racky,Description of a legally compliant construction site documentation taking into account the technical aids available today, Bachelor, Status: completed.
2015 - 09 Röhlich, Kim, Supervisor : Franz, Racky,Construction logistics in building construction, Bachelor, Status: completed.
2015 - 08 Hobein, Benjamin, Supervisor : Franz, Gnerlich,Creation and analysis of a detailed target schedule for the renovation work of an accommodation facility, Master, Status: completed.
2015 - 08 Kammerath, Arne, Supervisor : Franz, Reul,Investigation of different variants for the production of an excavation support on a concrete example and construction process comparison, Bachelor, Status: completed.
2015 - 08 Wiederhold, Markus, Supervisor : Franz, R. Gnerlich,Validation of the interfaces of Autodesk Revit with building-specific programs for structural design, thermal insulation verification, creation of bills of quantities, cost planning and calculation on a specific project, Master, Status: completed.
2015 - 07 Klambauer, Andreas, Supervisor : Franz, Gnerlich,Creation and analysis of a detailed target schedule, for all trades in the new construction of a 6-family house, Master, Status: completed.
2015 - 07 Merkulov, Michael, Supervisor : Franz, Gnerlich,Creation and analysis of a detailed target schedule, for all trades in the new construction of 4 low-energy terraced houses, Bachelor, Status: completed.
2015 - 06 Eberhardt, Eike, Supervisor : Franz, Racky,Time recordings for the incremental launching method in bridge construction, Bachelor, Status: completed.
2015 - 05 Menglei, Wu, Supervisor : Franz, Busch,Analysis of the Chinese real estate market and comparison with Western countries, Master, Status: completed.
2015 - 04 Ailabouni, David, Supervisor : Franz, Racky,Controlling in the construction industry - tasks, objectives and methods, Master, Status: completed.
2015 - 03 Rösner, Mario, Supervisor : Franz, Racky,Verfahren der Wertermittlung von Grundstücken und Gebäuden, Diploma thesis (Study level I), Status: completed.
2015 - 03 Stiglitz, Yasmin, Supervisor : Franz, Frechen,Repair of sewage pipes, investigation of different methods and comparison of economic efficiency using the example of the construction project "Rothenditmold 3BA", Bachelor, Status: completed.
2015 - 01 Lovrekovic, Helena, Supervisor : Franz, Thome,Development of a market analysis for a consulting company in the field of sustainable municipal heat supply, Bachelor, Status: completed.
2014 - 11 Sobeh, Zouheir, Supervisor : Franz, Racky,Risk management in the tender processing phase in construction companies, Master, Status: completed.
2014 - 10 Endres, Florian, Supervisor : Franz, F. Kugler,Analysis of the construction process and target/actual comparison using the example of a construction project in Kassel, Master, Status: completed.
2014 - 07 Hobein, Benjamin, Supervisor : Franz, Racky,Analysis of the time and cost effects due to disruptions in the construction process in a real construction project in Kassel from the client's point of view, Master, Status: completed.
2014 - 03 Neisner, Tanja, Supervisor : Franz, F. Kugler,Use of project, communication and management systems in construction projects, Bachelor, Status: completed.
2014 - 03 Gasz, Katharina, Supervisor : Becker, Franz,Transport and installation of precast concrete elements, here precast manhole elements for the wastewater sector, Bachelor, Status: completed.
2013 - 11 Gümüs, Bülent, Supervisor : Franz, Schmitt,Use of subcontractors in building construction on German construction sites, Bachelor, Status: completed.
2013 - 05 Wiederhold, Markus, Supervisor : Franz, F. Kugler,BIM-based construction site equipment, Bachelor thesis, Status: completed.
2013 - 03 Knobel, Katharina, Supervisor : Franz, Racky,Investigation of different design variants for the production of a steel connecting bridge, Bachelor thesis, Status: completed.
2013 - 01 Mengel, Markus, Supervisor : Franz, F. Kugler,Standardization of tendering and invoicing of work in public sewer construction to improve legal certainty, Diploma thesis (study level I), Status: completed.
2012 - 10 Gertler, Robert, Supervisor : Franz, Schopbach,Energy consumption on construction sites in building construction and civil engineering, Diploma thesis (Study level I), Status: completed.
2012 - 09 Kärsten, Daniel, Supervisor : Franz, Mollenhauer,Analysis of construction process disruptions, causes and effects during the new construction of the railroad line between Erfurt and Ilmenau, Bachelor thesis, Status: completed.
2012 - 07 Gnerlich, Ralf, Supervisor : Franz, F. Kugler,Development of a concept for interactive 4D visualization in the course of the simulation of construction processes, Master thesis, Status: completed.
2012 - 07 Dastjerd, Bahareh Vakili, Supervisor : Franz, Schopbach,Approaches to improve craft training using the example of carpentry in Iran, Master's thesis, Status: completed.
2012 - 06 Bollmann, Magdalena, Supervisor : Franz, Theobald,Analysis of process flows and target/actual comparison in the construction project: New construction of a harbor pier for the city of Barth, Bachelor thesis, Status: completed.
2012 - 06 Wolf, Wladimir, Supervisor : Franz, Schmitt,Identification of the improvement potential with the help of multi-moment recordings according to REFA and the methods of lean construction for the trades cavity floor and dry construction, Master's thesis in industrial engineering (focus on construction), Status: completed.
2012 - 04 Steinhäuser, Markus, Supervisor : Franz, Racky,Strategic planning for the development and implementation of a knowledge culture in the management of small and medium-sized construction companies, Master's thesis, Status: completed.
2012 - 01 Jünemann, Hanna Helene, Supervisor : Franz, M. Kugler,Investigation of the application possibilities of the event-driven process chain (EPK) in the company, Master thesis, Status: completed.
2011 - 10 Astour, Habeb, Supervisor : Franz, M. Kugler,Development of a concept for linking CiSmo with a BIM application environment (Autodesk Revit) and implementation using the example of wall parameters, Master's thesis, Status: completed.
2011 - 10 Bitsilia, Maximilian, Supervisor : Franz, Racky,Analysis and evaluation of knowledge management methods and tools for implementation in the management of small construction companies, Diploma II, Status: completed.
2011 - 09 Bachmann, Christopher K., Supervisor : Franz, Racky,Reorganization of a medium-sized company to optimize process flows, Diploma II, Status: completed.
2011 - 07 Sachs, Stephan, Supervisor : Franz, Racky,Historical development of knowledge management and analysis of case studies from the literature, Diploma I, Status: completed.
2011 - 06 Ott, Christian, Supervisor : Franz, Racky,Detailed cycle planning for effective work preparation and control of a critical construction phase in the partial new construction of the "Bridge of Town Twinning" in Rotenburg a.d. Fulda, Diploma I, Status: completed.
2011 - 06 Bleichert, Oliver, Supervisor : Franz, M. Kugler,Validation and verification of the simulation system CiSmo based on the application in the construction of a passive house housing estate, Diploma II, Status: completed.
2011 - 05 Schneider, David, Supervisor : Franz, M. Kugler,Evaluation of a simulation system for construction sequence planning in building construction based on the application in the construction of a nursing home for the elderly, Diploma I, Status: completed.
2011 - 03 Riemenschneider, Julia, Supervisor : Franz, Racky,Possibilities for the implementation of knowledge management systems and methods in small and medium-sized construction companies, Diploma I (Industrial Engineering-Construction), Status: completed.
2010 - 11 Jurkowski, Grit, Supervisor : Franz, Racky,Analysis of the processes in the production and warehousing of a medium-sized metal construction company and investigation of the potential for improvement, Diploma II (Industrial Engineering and Management), Status: completed.
2010 - 08 Schappert, Markus, Supervisor : Franz, Racky,Analysis of the economic efficiency of ceiling table systems of selected manufacturers, Diploma I, Status: completed.
2010 - 08 Orschulok, Ralf, Supervisor : Franz, Racky,Development of a documentation system for the construction supervision of the AG and description of the application of the system using the example of the new streetcar line Kassel-Vellmar, Diploma I, Status: completed.
2010 - 08 Kök, Kemal, Supervisor : Franz, Racky,Detail planning for the turnkey construction of a single-family house, Diploma I, Status: completed.
2010 - 08 Kornet, Mariana, Supervisor : Franz, Lang,Impact of a delayed contract award on the contractor's remuneration claims in construction contracts, Diploma I, Status: completed.
2010 - 08 Heinemann, Florian, Supervisor : Franz, Racky,Comparison of the economic efficiency of prefabricated sand-lime brick lintels compared to on-site lintel systems, Diploma I, Status: completed.
2010 - 07 Barba, Vincenzo, Supervisor : Franz, Racky,Cost and process comparison of different construction methods for the rehabilitation of sewage pipes, Diploma I, Status: completed.
2009 - 08 Griech, Gerd Heino, Supervisor : Franz, Racky,Valuation of land and buildings, Diploma I, Status: completed.
2009 - 07 Wiegand, Bettina, Supervisor : Franz, M. Kugler, Implementation of a path-finding algorithm for agent-based simulation models in structural engineering, Diploma I, Status: completed.
2009 - 04 Osmers, Dirk, Supervisor : Franz, M. Kugler,Development of a simulation model for the consideration of construction site logistics in building construction, Diploma II, Status: completed.
2009 - 03 Vollweiler, Maik, Supervisor : Franz, Racky,Development of a defect management system for craft businesses using the example of external thermal insulation composite systems, Diploma I, Status: completed.
2009 - 03 Sikorski, Oliver, Supervisor : Franz, Racky,Contributions of construction logistics to green building certification according to LEED (Leadership in Energy and Environmental Design), Diploma II, Status: completed.
2009 - 01 Kram, Marius, Supervisor : Franz, M. Kugler,Integration of a structural analysis application into a CAD system, Diploma II, Status: completed.
2008 - 12 Bering, Alexander, Supervisor : Franz, M. Kugler,Recording of execution dependencies in the finishing trades of building construction, Diploma I, Status: completed.
2008 - 09 Fischer, Thomas, Supervisor : Franz, Racky,Logistik im Hochhausbau - Eine Untersuchung zum Rollenverständnis der Baulogistik bei der Abwicklung komplexer Bauprojekte am Beispiel FrankfurtHochVier, Diploma II, Status: completed.
2008 - 08 Edris, Ramez, Supervisor : Franz, M. Kugler,Process Modeling in Building Construction, Diploma II, Status: completed.
2008 - 07 Trautmann, Frank, Supervisor : Franz, Maas,Cost-benefit analysis for the reduction of energy costs using the example of a building in Merxhausen, Status: completed.
2008 - 07 Kordi, Basel, Supervisor : Franz, M. Kugler,Development of an interface between CAD and project management software, Diploma II, Status: completed.
2008 - 07 Demir, Tuncay, Supervisor : Franz, M. Kugler,Baubetriebliche und rechtliche Aspekte beim Einsatz ausländischer Werkvertragsarbeitnehmer in der Bundesrepublik Deutschland aus Nicht-EU-Ländern, Diploma I, Status: completed.
2008 - 05 Müller, Andre, Supervisor : Franz, Stolzenberg,Target/actual analysis of construction processes on specific projects, Diploma I, Status: completed.
2008 - 05 Haas, Alexander, Supervisor : Franz, Becker,Introduction of the occupational health and safety management system BAU (AMS BAU) in a medium-sized construction company, Diploma I, Status: completed.
2008 - 05 Grote, Lars, Supervisor : Franz, Racky,Development of an instrument for the project-related recording of working hours in the architectural office and comparison of the time spent on completed projects with the HOAI fee rates, Diploma II, Status: completed.
2007 - 04 Rathswohl, Stefan, Supervisor : Franz, Stolzenberg,Assessment of management effort in the construction industry, Diploma I, Status: completed.
2007 - 03 Schwarz, Robert, Supervisor : Franz, Machner,Concreting at low temperatures - Possible effects on concrete and methods to avoid concrete damage, Diploma I, Status: completed.
2007 - 02 Kaiser, Michael, Supervisor : Franz, Theobald,Qualitative and quantitative recording of disturbances in the sliding construction process using the example of the production of a substitute fuel power plant, Diploma II, Status: completed.
2006 - 12 Worobiow, David, Supervisor : Franz, Schopbach,Quotation calculation for buildings in timber frame construction, Diploma I, Status: completed.
2006 - 12 Kugler, Martin, Supervisor : Franz, Chahrour,Agent-based simulation of an extension project in building construction, Diploma II, Status: completed.
2006 - 10 Konradi, Alexander, Supervisor : Franz, Balk,Investigation of the economic efficiency of various energy measures using the example of an apartment building in Fuldabrück-Bergshausen, Diploma II, Status: completed.
2006 - 10 Geiger, Artur, Supervisor : Franz, Machner,Concreting process at low outside temperatures, Diploma I, Status: completed.
2006 - 09 Duan, Ruihui, Supervisor : Franz, Chahrour,Preparation of a simulation study for the project ICE-Neubaustrecke Ebensfeld-Erfurt, Diploma II, Status: completed.
2006 - 07 Dai, Jie, Supervisor : Franz, Chahrour,Development of a JAVA-Tool to adapt input data of the simulation to theoretical distribution functions, Diploma II, Status: completed.
2006 - 04 Szopa, Andreas, Supervisor : Franz, Chahrour,Post-calculation and optimization of earthwork processes using the example of the new ICE line Ebensfeld-Erfurt, Diploma I, Status: completed.
2006 - 03 Streck, Christoph, Supervisor : Franz, Utsch,The importance of organization, information and research for planning and decision-making in construction operations - illustrated by current contributions to the English-language literature, Diploma I, Status: completed.
2006 - 01 Reingardt, Alexander, Supervisor : Franz, Racky,Soll-Ist-Anaylse der Herstellung von Abwasserleitungen in geschlossner Bauweise, Diploma I, Status: completed.
2006 - 01 Osmers, Dirk, Supervisor : Franz, Becker,Development of a guideline for the occupational safety planning of buildings with special consideration of the later use, Diploma I, Status: completed.
2005 - 09 Souidi, Abderhaman Redha, Supervisor : Franz, Minke,Production techniques in earth building, effort and cost comparison with traditional construction methods using the example of a mosque in Wabern, Diploma I, Status: completed.
2005 - 09 Schleicher, Melanie, Supervisor : Franz, Utsch,Order processing in special civil engineering - Investigation of the effects of planning and decision-making deficits in construction order processing, Diploma I, Status: completed.
2005 - 09 Funk, Thorsten, Supervisor : Franz, Utsch,Investigations on application possibilities and economic efficiency of UHPC in residential construction, Diploma II, Status: completed.
2005 - 08 Iacovelli, Daniele, Supervisor : Franz, Stolzenberg,Analysis of exposed concrete surfaces, evaluation of tendering and execution, Diploma I, Status: completed.
2005 - 08 Herlein, Igor, Supervisor : Franz, Utsch,Sequence planning of the Regiotram - connection to the Kassel main station with special consideration of the construction site logistics, Diploma I, Status: completed.
2005 - 07 Könnyü, Sandor Attila, Supervisor : Franz, Hübner,Optimization considerations for the construction process during the energetic renovation of a 7-storey Hungarian prefabricated building within the EU project Solanova, Diploma I, Status: completed.
2005 - 07 Haurand, Daniel, Supervisor : Franz, Schopbach,Kostenoptimierte Bemessung im Holzrahmenbau, Diploma I, Status: completed.
2005 - 06 Walter, Klaus, Supervisor : Franz, Schopbach,Quotation calculation for buildings in timber frame construction, Diploma II, Status: completed.
2005 - 05 Kowanda, Florian, Supervisor : Franz, Utsch,Importance of information as a production factor in construction operations - Investigation of deficits and development of suggestions for improvement, Diploma I, Status: completed.
2004 - 12 Bierwirth, Christian, Supervisor : Franz, Schopbach,Dimensioning of ceiling structures in timber construction with special consideration of DIN 1052-Neu and the associated costs, Diploma I, Status: completed.
2004 - 11 Wheda, Khaled, Supervisor : Franz, Racky,Comparison of methods and costs for the production of sewage pipes in open and closed construction, Diploma I, Status: completed.
2004 - 10 Bode, Katrin, Humpe, Petra, Supervisor : Franz, Utsch,Investigations on the changes in the corporate structure and construction management working methods of construction companies in masonry construction, Diploma I, Status: completed.
2004 - 09 Dormann, Rüdiger, Supervisor : Franz, Utsch,Documentation and evaluation of working time studies in masonry construction - conception of a planning instrument, Diploma I, Status: completed.
2004 - 09 Brill, Tamara, Supervisor : Franz, Utsch,Methodenforschung im Baubetrieb - ein Konzept zur empirischen Untersuchung, Diploma I , Status: completed.
2004 - 08 Yildirim, Muharrem, Supervisor : Franz, Schopbach,Wall panel design in timber frame construction with special consideration of DIN 1052-Neu and the associated costs, Status: completed.
2004 - 08 Wegener, Christian, Supervisor : Franz, Utsch,Comparison of methods for the selection of ground improvement measures, Diploma I, Status: completed.
2004 - 08 Stichnoth, Philipp, Supervisor : Franz, Utsch,Logistik im Baubetrieb, Untersuchungen an einem Referenzobjekt, Diploma II, Status: completed.
2004 - 07 Müller, Jürgen, Supervisor : Franz, Utsch,Post-calculation in tunnel construction - investigations in a reference company, Diploma II, Status: completed.
2004 - 05 Hottenroth, Ingo, Supervisor : Franz, Utsch,Studies on construction time and construction cost planning in masonry construction using the example of a reference object, Diploma I, Status: completed.
2004 - 04 Izzat-Agha, Sabina, Supervisor : Franz, Schopbach,Roof structures for timber frame construction with special consideration of DIN 1052-Neu and the associated costs, Diploma II, Status: completed.
2003 - 12 Nolte, Christoph, Supervisor : Franz,Praxisorientierte Analyse von Erdbauprozessen, Diploma I, Status: completed.
2003 - -- Winkelmann, Claus, Supervisor : Franz, Schopbach,Building bracing in timber frame construction according to DIN 1052-Neu with special consideration of costs, Diploma II, Status: completed.
2003 - -- Werner, Gerrit, Supervisor : Franz,Entscheidungsfindung bei der Planung von Instandsetzungsarbeiten am Beispiel der Götzenhofbrücke bei Fulda, Diploma I , Status: completed.
2003 - -- Manthey, Gordon, Supervisor : Franz,Kostenerfassung der Erdbauprozesse in Abhängigkeit vom Maschineneinsatz, Diploma I., Status: completed.
2003 - -- Funk, Thorsten, Supervisor : Franz,Investigation on the application of mathematical methods for the optimization of reinforced concrete structures, Diploma I , Status: completed.
2003 - -- Flörke, Mike, Supervisor : Franz, Racky,Comparison of methods in masonry construction, Diploma I , Status: completed.
2003 - -- Emme, Utz, Supervisor : Franz, Stolzenberg,Application of fuzzy algorithms in simulation using the example of concrete supply in paving stone production, Diploma I , Status: completed.
2003 - -- Alles, Daniel, Supervisor : Franz,Optimization potentials of earthwork processes using the example of a road construction site, Diploma I., Status: completed.
2002 - -- Özcan, Sinan, Supervisor : Franz, Stolzenberg,Manufacturing Processes in Large Bridge Construction Criteria for Process Selection, Diploma I., Status: completed.
2002 - -- Vogt, Denis, Supervisor : Franz, Stolzenberg,Market analysis of turnkey single-family houses in the northern Hessian region, Diploma 1st, Status: completed.
2002 - -- Störmer, Bertram, Supervisor : Franz, Stolzenberg,Comparison between quality management systems in mechanical engineering and construction, Diploma I., Status: completed.
2002 - -- Stichnoth, Philipp, Supervisor : Franz, Racky,Analysis and improvement of logistics in the building materials trade, Diploma I., Status: completed.
2002 - -- Schmidt, Ralph, Supervisor : Franz, Stolzenberg,Ermittlung von Kalkulationsansätzen für Straßenbauarbeiten, Diploma I., Status: completed.
2002 - -- Pudewell, Ralf, Supervisor : Franz, Stolzenberg,Möglichkeiten der Kostenrechnung in der Betonsteinindustrie unter Einsatz der dynamischen Simulation, Diploma I., Status: completed.
2002 - -- Müller, Jürgen, Supervisor : Franz,Target/actual comparison in tunnel driving using the example of the Hopfenberg Tunnel, Diploma I., Status: completed.
2002 - -- Möhring, Jana, Supervisor : Franz, Stolzenberg,Impact of the introduction of the Ordinance on Safety and Health Protection on Construction Sites (BaustellV) on those involved in construction, Diploma 1st, Status: completed.
2002 - -- Manolika, Ekaterini, Supervisor : Franz, Stolzenberg,Application of optimization algorithms in simulation using the example of concrete supply in paving stone production, Diploma II, Status: completed.
2002 - -- Kauffunger, Marco, Supervisor : Franz, Stolzenberg,Development of a concept for dynamic parameter optimization by means of simulation using the example of concrete supply in paving stone production, Diploma I., Status: completed.
2002 - -- Karaköse, Ali Ekber, Supervisor : Franz, Stolzenberg,Process for the production of steel sheet piles, Diploma I., Status: completed.
2002 - -- Kaiyal, Wiam, Supervisor : Franz, Stolzenberg,Recording and analysis of the cost and planning structure of residential buildings in timber frame construction, Status: completed.
2002 - -- Heymel, Dana, Supervisor : Franz,Investigation of the planning flexibility due to different expansion stages in prefabricated private residential buildings in timber frame construction, Diploma I., Status: completed.
2002 - -- Heptner, Martin, Supervisor : Franz, Racky,Calculation types in the construction process and their use using the example of the renovation of the Oskar-von-Miller-School, Block B, in Kassel, Diploma I., Status: completed.
2001 - -- Zaitsev, Mark, Supervisor : Franz, Stolzenberg,Support of reporting in companies through database-based tools using the example of application software for industrially managed carpentry companies, Diploma II, Status: completed.
2001 - -- Tönges, Ingolf, Supervisor : ,Revision and improvement of the internal accounting system, Diploma I., Status: completed.
2001 - -- Skotnik, Jacek, Supervisor : Franz, Stolzenberg,Risk management-practical introduction and implementation in the project process using risk checklists, Diploma I., Status: completed.
2001 - -- Seguin, Markus, Supervisor : Franz, Neuenhagen,Profitability calculations for the reorganization of a carpentry business, Diploma II, Status: completed.
2001 - -- Rüdiger, Dietrich, Supervisor : Franz, Stolzenberg,Analysis of the savings potential in residential construction through the use of suitable optimization methods, Diploma I., Status: completed.
2001 - -- Rosom, Daniela, Supervisor : Franz, Stolzenberg,Analysis of the production and organization of two plants for the production of prestressed concrete ceiling panels, Diploma I., Status: completed.
2001 - -- Reiß, Kirsten, Supervisor : Franz, Stolzenberg,Control of the planning process during execution planning using the example of the City-Point Kassel, Diploma I., Status: completed.
2001 - -- Regler, Markus, Supervisor : Franz, Stolzenberg,Work contracts with foreign subcontractors, Diploma I., Status: completed.
2001 - -- Oster, Christian, Supervisor : Franz, Reinhardt,Development of a model for the simulation of workflow management processes in joinery centers, Diploma II, Status: completed.
2001 - -- Müller, Manfred, Supervisor : Franz, Stolzenberg,Design of a database system for internal data acquisition in concrete paver production, Diploma I., Status: completed.
2001 - -- Mackensen, Reinhard, Supervisor : Stolzenberg, Franz,Database application in the construction industry for cost control software, Diploma II, Status: completed.
2001 - -- Koch, Dirk, Supervisor : Franz, Neuenhagen,Market analysis of stationary machines and plants in modern timber construction companies, Diploma I., Status: completed.
2001 - -- Knopp, Martin, Supervisor : Franz, Stolzenberg,Wandel der Arbeitsfelder in der Bauunternehmung, Diploma I., Status: completed.
2001 - -- Knoll, Monika, Supervisor : ,Development of a database system for detailed cost recording and allocation in the concrete products industry, Diploma I., Status: completed.
2001 - -- Kahmann, Hendrike, Supervisor : ,Influence of technical and climatic conditions on the structural requirements in concrete construction in different countries, Diploma I., Status: completed.
2001 - -- Hillebrand, Nina, Supervisor : Franz, Neuenhagen,Modification and extension of an element catalog with data for computer-aided cost calculation of buildings in timber frame construction, Diploma I., Status: completed.
2001 - -- Henschel, Dennis, Supervisor : ,Sequence planning of the repair of locks during operation, Diploma I., Status: completed.
2001 - -- Grebe, Isabell, Supervisor : Franz, Neuenhagen,Beispiel zur Umsetzung der Deckungsbeitragsrechnung in Zimmererbetrieben, Diploma I., Status: completed.
2001 - -- Franke, Dieter, Supervisor : Franz, Stolzenberg,Bauablaufplanung bei Umbau und Sanierung am Beispiel eines Verwaltungsgebäudes, Diploma II, Status: completed.
2001 - -- Deis, Inga, Supervisor : Franz, Neuenhagen,Comparison of the derivation of surcharge rates for the calculation with predetermined surcharges using the example of craft enterprises, Diploma I., Status: completed.
2001 - -- Chahrour, Racha, Supervisor : Franz, Stolzenberg,Suitability of building block oriented simulators for the modeling of construction processes, Diploma II, Status: completed.
2001 - -- Böttner, Thilo, Supervisor : Franz, Fricke,Development of the structures of a document management system in the construction industry, Diploma II, Status: completed.
2001 - -- Brand, Jens, Supervisor : Franz, Neuenhagen,Determination of idle times during order processing in a joinery center, Diploma I., Status: completed.
2001 - -- Boland, Stefan, Supervisor : ,Sichtbeton von der Ausschreibung bis zur Abnahme, Diploma I., Status: completed.
2001 - -- Behnisch, Thomas, Supervisor : ,Economic feasibility study on the development of three different types of houses using the example of the planning area of the former Jägerkaserne at Park Schönfeld in Kassel, Diploma II, Status: completed.
2001 - -- Appel, Alexander, Supervisor : Franz, Neuenhagen,Investigation of business processes in a modern timber construction company with the support of REFA methodology, Diploma II, Status: completed.
2000 - -- Zeuner, Michael, Supervisor : ,Dynamic simulation of the thermal behavior of a residential building, Diploma I., Status: completed.
2000 - -- Wiegand, Dirk, Supervisor : ,Analyse und Datenermittlung mit Hilfe der REFA-Methodenlehre in der Arbeitsvorbereitung eines Abbundzentrums, Diploma I., Status: completed.
2000 - -- Vogel, Marco, Supervisor : ,Ermittlung von Gebäudekenndaten bei der energetischen Vor-Ort-Beratung, Diploma I., Status: completed.
2000 - -- Utsch, Jens H., Supervisor : Franz,Kostenoptimierung von Baukonstruktionen im Zuge der Bemessung unter besonderer Berücksichtigung von Operations Research-Methoden, Diploma II., Status: completed.
2000 - -- Steinl, Thomas, Supervisor : Franz, Stolzenberg,Special features and risks in foreign construction from a construction management perspective, Diploma II., Status: completed.
2000 - -- Stein, Julia, Supervisor : Franz, Stolzenberg,Einsparungspotential im Wohnungsbau durch den Einsatz geeigneter Optimierungsmethoden, Diploma I., Status: completed.
2000 - -- Schneider, Richard, Supervisor : Franz, Stolzenberg,Development of an EDP-supported system for the documentation of construction delays and performance changes during construction, Diploma II, Status: completed.
2000 - -- Schindehütte, Guido, Supervisor : Franz, Neuenhagen,Investigation of the cost structures of different timber construction projects with special consideration of different substitution variants, Diploma I., Status: completed.
2000 - -- Poller, Sebastian, Supervisor : Franz, Stolzenberg,Controlling in der Bauunternehmung, Diploma II., Status: completed.
2000 - -- Münch, Volker, Supervisor : Franz, Stolzenberg,Development of a Simultation Model for Work Preparation in Joinery Centers, Diploma 2nd, Status: completed.
2000 - -- Möller, Uwe, Supervisor : ,Bauablaufplanung für den Ausbau eines Verwaltungsgebäudes - aus Sicht des Generalunternehmers - Diplom I., Status: abgeschlossen.
2000 - -- Meyke, Bernd, Supervisor : Franz, Fricke,Investigation of the causes of obstructions and proof of the resulting additional costs according to VOB Part B using the example of the conversion of an administration building, Diploma II, Status: completed.
2000 - -- Markolf, Ellen, Supervisor : ,Abfallaufkommen und Entsorgungskonzepte bei Baumaßnahmen, Diploma I., Status: completed.
2000 - -- Marcus, Adrian, Supervisor : Franz, Stolzenberg,Einsatz von Kalkulationsprogrammen in Bauunternehmen, Diploma I., Status: completed.
2000 - -- Manolika, Katarina, Supervisor : Franz,Deconstruction concept and statistical survey of quantities during the demolition of a department store, Diploma I., Status: completed.
2000 - -- Löwer, Volker, Supervisor : Franz, Stolzenberg,Conversion of the EDP system in the technical department of a construction company, Diploma I., Status: completed.
2000 - -- Lotze, André, Supervisor : Franz, Stolzenberg,Support of work preparation by extending an EDP tool for solving linear problems, Diploma II, Status: completed.
2000 - -- Kuhlmann, Gunnar, Supervisor : Franz, Stolzenberg,Extension of a project management program to support non-deterministic construction scheduling, Diploma I., Status: completed.
2000 - -- Kuckenburg, Roland, Supervisor : ,Ablaufplanung und Fristenberechnung für den Rohbau des Neubausbaus für das Universitätsklinikum der Phillips-Universität Marburg, Diploma II, Status: completed.
2000 - -- Klippert, Tobias, Supervisor : Franz, Stolzenberg,Impact of the quality management system on the employees in a construction company, Diploma I., Status: completed.
2000 - -- Klingebiel, Gerd, Supervisor : Franz, Neuenhagen,Improvement of business processes in a joinery center, Diploma II, Status: completed.
2000 - -- Klatt, Swenja, Supervisor : ,Translucent thermal insulation, Diploma I., Status: completed.
2000 - -- Kappel, Knut, Supervisor : ,Grundstücks- und Gebäudebewertung als Instrument der Entscheidungsfindung bei Investitionsausgaben für Immobilien, Diploma II., Status: completed.
2000 - -- Hübel, Olaf, Supervisor : ,Possibilities of rationalization in residential construction using the example of a small regional construction company, Diploma I., Status: completed.
2000 - -- Hoßbach, Frank, Supervisor : Franz, Stolzenberg,Analysis of the weak points in logistics in a construction company in the field of turnkey housing construction with prefabricated components, Diploma I., Status: completed.
2000 - -- Hohberg, Andreas, Supervisor : Franz, Neuenhagen,Improvement and integration of operational accounting in a training center, Diploma I., Status: completed.
2000 - -- Hermelink, Andreas, Supervisor : ,Analysis of the suitability of the GMP method using the example of a realistic project, Diploma I., Status: completed.
2000 - -- Haschemzada, Said Abdullah, Supervisor : ,Investigation of the organizational structures of a joint venture project using the example of the 6 x 350 MW coal-fired power plant in China, Diploma I., Status: completed.
2000 - -- Gräfe, Michael, Supervisor : ,Marktanalyse horizontaler Schalungssysteme für Decken und Unterzüge, Diploma I., Status: completed.
2000 - -- Grimm, Andreas, Supervisor : Franz, Stolzenberg,Conversion of a quality management system in a Hessian metal construction company from element-oriented structures to process-oriented procedures (DIN Norm 9000ff. Edition 2000), Diploma I., Status: completed.
2000 - -- Gerber, Achim, Supervisor : ,Kosten-Nutzen-Analyse am Beispiel der Lossetalbahn, Diploma I., Status: completed.
2000 - -- Ebrahimian, Mehran, Supervisor : ,Sequence planning of the extended building shell using the example of the postal service freight center in Hagen-Fley, Diploma I., Status: completed.
2000 - -- Beier, Gerd, Supervisor : ,Development of shotcrete systems for special applications, Diploma I., Status: completed.
1999 - -- Simon, Patrik, Supervisor : ,Optimierung der Baustelleneinrichtung unter besonderer Berücksichtigung des Einsatzes Operation Research Methoden, Diploma I., Status: completed.
1999 - -- Schöttmer, Severin, Supervisor : ,Selective and recycling-oriented deconstruction of buildings - Consideration of the technical, economic and ecological feasibility under consideration of the Recycling and Waste Management Act, Diploma I., Status: completed.
1999 - -- Pflüger, Oliver, Supervisor : ,Optimization of assembly processes using network-based simulation models - comparison of different model approaches, Diploma II., Status: completed.
1999 - -- Bieker, Cornelia, Supervisor : ,Optimization in Construction by Operations Research Methods, Diploma II., Status: completed.
1999 - -- Beulke, Reinhard, Supervisor : ,Development of an internet tool for emission and immission impact analysis of combined water treatment measures, Diploma II., Status: completed.